top of page

DEMOLITION TRACK RECORDS

Shah Alam Stadium
Stadium Shah Alam Demoltion
Highrise Demolition KL JB
Highrise Demolition KL
Diamond Cutting Malaysia
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
Highrise Building Demolition
IMG_1662

YEAR             PROJECT DESCRIPTION

2026

(**On Going)

  • Demolition of Existing Plaza Sentosa and Associated Works. **

  • Demolition of Stadium Shah Alam for Redevelopment of Kompleks Sukan Shah Alam (KSSA) Selangor. **

2025

  • Demolition of Existing 13-Storey Hotel Sentral JB at Jalan Tenteram, Johor Bahru.

  • Architectural Demolition Works for Hangar 2,3,4 & Multistorey Carpark and Structural Demolition for Inflammable Store & Link Bridge Including Transfer and Removal of Existing Loose Furniture at Complex A, Lapangan Terbang Antarabansa Sultan Abdul Aziz Shah, Subang.

  • Demolition Works for 6 Units of Existing 4-Storey Shop Lot at Jalan Lepas, Johor Bahru.

2024

  • Demolition Works for GSE Building & Pedestrian Bridge, Cleaning & Clearing Works for All MRO Buildings and Removal of Docking at Subang Engineering Complex A, Lapangan Terbang Antarabangsa Sultan Abdul Aziz Shah, Subang.

  • Demolition of 6 Blocks 4-Storey to 8-Storey Condominium at Lot 263,  Jalan Madge, Kuala Lumpur.

  • Site Clearance and Installation of Hoarding at Lot 499, Lot 353 and Lot 354, Seksyen 71, Bukit Tunku, Kuala Lumpur.

  • Demolition Works for Reinstatement of Bukit Jalil Casting Yard (SUKE Highway Project).

  • Demolition Works for Expansion & Upgrading of Existing Lapangan Terbang Sultan Ismail Petra (Kota Bharu Airport).

  • Demolition Works of Mint Modernisation Project for Bank Negara Malaysia at Lot 2, Persiaran Selangor (Phase 1 & Phase 2).

2023

  • Demolition Works for Existing Concrete Slabs and Capping Beams at Conlay Station, Kuala Lumpur (KVMRT Line 2).

  • Demolition of Existing Substructure for Construction of New RC Columns & Micropiles at Mutiara Damansara.

  • Demolition Works for TIEM2 Project at Free Trade Zone, Melaka.

2022

  • Demolition Works for Road Bridge Structure - ROB for Section 1, Johor (EDTP - Gemas to Johor Bahru).

  • Demolition Works for River Bridge Structure - BRV for Section 1, Johor (EDTP - Gemas to Johor Bahru).

  • Demolition Works for Existing Buildings and Structures at CLQ CLAB (KVMRT Line 2). 

  • Demolition of Reinforced Concrete Structure, Steel Structure and Associated Works at Bandar Malaysia South Batching Plant (KVMRT Line 2).

2021

  • Demolition Works for The Existing Structure at Lot 1, Kajang, Selangor Darul Ehsan (Lot 1 Kajang). (Hybrid Demolition Method)

  • Demolition Works at PT13746, Jalan Inovasi 3, Technology Park Malaysia, Mukim Petaling, Wilayah Persekutuan, Kuala Lumpur (Project Lion Data Centre).

  • Demolition of Existing Warehouse at Lumut, Perak. 

  • Supply Labour, Plant and Machinery for Carry Out Diamond Coring and Wire Saw Cutting Works to R.C Slab and Diaphragm Wall at Sentul West Station, Kuala Lumpur (KVMRT Line 2).

  • Demolition Works for Reinforced Concrete Structure, Steel Structure and Associated Works at Titiwangsa Batching Plant, Kuala Lumpur (KVMRT Line 2).

  • Demolition Works for Diaphragm Wall at Hospital Kuala Lumpur Crossover and Intervention Shaft 1 (KVMRT Line 2).

2020

  • Demoliton of Portion of Existng Structures for Addition and Alteration Work at Chan Sow Lin Station, Kuala Lumpur (KVMRT Line 2).

  • Demolition Works With All Associated Works Pedestrian Bridge for Section 3 & ROB30, ROB31, ROB32 for Section 5, Johor (EDTP - Gemas to Johor Bahru).

  • Demolition Works for Labour Accommodation Camp, Site Office, & Canteen for Petronas Rapid Project at Pengerang (Phase 2), Johor.

  • Demolition Works for Diaphragm Wall at Kampung Baru North Station, Kuala Lumpur (KVMRT Line 2).

2019

  • Demolition Works for Labour Accommodation Camp, Site Office, & Canteen for Petronas Rapid Project at Pengerang (Phase 1), Johor.

  • Demolition and Pile Removal to 4-Storey UKM College Hostel and 5 Storey Shoplots at Kg Baru Area, Kuala Lumpur (KVMRT Line 2).

  • Completion of RC Pile Removal of Hospital Kuala Lumpur Crossover & Intervention Shaft 1, Kuala Lumpur (KVMRT Line 2).

2018

  • Demolition Works for MRT Package V205: Construction and Completion of Viaduct Guideway and Other Associated Works from Kg. Muhibbah to Serdang Raya. 

  • Demolition Works for MRT Package V201: Construction and Completion of Viaduct Guideway and Other Associated Works from Sungai Buloh to Persiaran Dagang. 

  • Demolition Works for MRT Package V203: Construction and Completion of Viaduct Guideway and Other Associated Works from Jinjang to Jalan Ipoh North Portal. 

  • Demolition of 100 meter Main Stack (Chimney) & other structure for redevelopment of Lafarge Rawang Plant.

  • Demolition Works for Light Rail Transit Line 3 (LRT 3 - Package GS 07-08).

  • Demolition Works for MMC-Gamuda KVMRT site office & plants at Jalan Cochrane.

  • Demolition of Ampang Park Shopping Mall at Kuala Lumpur (KVMRT Line 2).

2016

2017

  • Demolition Works of the Existing 16-storeys PDRM Quarters at Jalan Sentul Manis, Kuala Lumpur (KVMRT Line 2). (Hybrid Demolition Method)

  • Demolition of Existing Abandoned 8-storey Wisma Awal & Other Buildings for Kampung Baru North Station (KVMRT Line 2). 

  • Demolition of Existing Sports Club at Lot 172, Jalan Tun Sambathan 1, Brickfield, Kuala Lumpur. 

  • Demolition of TNB Staff Quarters at Lot 491, Seksyen 96A, Bandar Kuala Lumpur. 

  • Demolition works including superstructure and substructure for the existing multi-storey carpark at KLCC East Underground Station (KVMRT Line 2).

  • Demolition works at Block C, Bangunan Sultan Abdul Samad for MRT Corp.

  • Demolition of existing 9 Blocks of 9 to 11-storeys Office Building for the Redevelopment of Pusat Bandar Damansara.

  • Demolition Works for The Proposed of Redevelopment of Kompleks Niaga Utama, Lot 350, Bangsar Kuala Lumpur. 

  • Demolition Works for the Completed Existing Police Quarters (Block 10 and 11) at Taman Keramat AU1, Ulu Kelang, Gombak, Selangor. 

  • Demolition of the pedestrian bridge and buildings at KTM Serdang. 

2015

​​

  • Demolition of existing 17- Storeys Condominium including podium carpark at Bangsar (Diamond Cutting & Lifting Method).

  • Demolition of Existing Police Station & 2 Blocks of 11- Storeys Police Quarters for 118 Storeys Warisan Merdeka-KL 118 Project. 

  • Demolition of KVMRT Tunnel Boring Plant at Jalan Inai (Including Existing Pile Extraction Work).

  • Demolition of existing concrete roof structure at B. Braun Project, Penang (Diamond Cutting & Lifting Method).

2013

2014

  • Demolition of existing SP Setia Clubhouse for proposed residential development at Pesiaran Kelicap, Pulau Pinang (Approx. 66,000m2).

  • Demolition of existing 7 Storeys Building & Shops Lot at Jalan P. Ramlee. (Rum Jungle)

  • Demolition of Existing Ramp Bridge at Pelabuhan Klang (Phase 2).

 

  • Demolition of Pedestrian Motor Bridge and Bernas Gantry at Arau, Perlis (+/-100m2).

  • Demolition of Sunway Putra Mall (The Mall), Kuala Lumpur (+/-9,000m2).

  • Demolition of Existing Ramp Bridge at Pelabuhan Klang (Phase 1).

2012

  • Demolition of Former Cigarette Building at Jalan Lahat, Ipoh (Approximately 4,500m2).

  • Demolition of Existing Road Over Bridge at Package N3 (Over 300m per bridge).

  • Demolition of Houses at Jalan Cheras. (Approximately 4,000m2) - MMC Gamuda.

  • Demolition of Roadside Kiosks Along Jln Bukit Bintang - MMC Gamuda.

  • Demolition of existing steel structure factory at Maluri Portal - MMC Gamuda.

  • Demolition of embankment parapet wall at Sg. Siput.

  • Demolition of Remaining Structures and Tree Trimming at Lot 92, Jln Telok Wanjah.

  • Demolition of Existing Alor Setar Shopping Complexe (+/- 36,120m2).

2011

  • Demolition of road over bridge at Kerai Kati.

  • Demolition of Hospital Tunku Fauziah, Kangar, Perlis (Using Non-Hacking Method).

  • Demolition Of Existing Pedestrian Motorcycle Bridge's Ramp at Sg. Siput, Perak (Diamond Cutting and Heavy Lifting).

  • Demolition of Existing Pedestrian Motorcycle Bridge at Kg. Alor Belat, Kedah.

  • Demolition of Existing Bridges at Jalan Teluk Wanjah, Alor Setar.

2010

  • Demolition of road over bridge Jalan Langgar, Alor Setar, Kedah. (At heart of city, live-traffic, limited work space).

  • Crushing granite at Lenggong, Perak (Crushing to crusher-run size).

  • Demolition of Monument (Heritage Structure) - Tugu Rukun Negara (Jalan Telok Wanjah).

  • Demolition of railway bridge Simpang Lawin, Kuala Kangsar.

  • Demolition of house at Taman Ipoh Selatan, Ipoh. (Working Area beside hospital).

2009

  • Demolition of Road Over Bridge, Kanthan

  • Demolition of existing parapet wall and deck slab for Penang Bridge

  • Crushing Granite at Selama, Perak

2008

  • ​​Demolition of Sg. Siput Balai Polis, Perak.

2007

  • Demolition of Makro, Bandar Perai, Seberang Jaya,Penang

  • Demolition of Damansara Clear Water, Selangor. (Removal of underground parking) 

 © 2021 Central Geo Sdn Bhd. All Rights Reserved.

bottom of page