DEMOLITION TRACK RECORDS
![]() | ![]() | ![]() | ![]() |
|---|---|---|---|
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
YEAR PROJECT DESCRIPTION
2026
(**On Going)
-
Demolition of Existing Plaza Sentosa and Associated Works. **
-
Demolition of Stadium Shah Alam for Redevelopment of Kompleks Sukan Shah Alam (KSSA) Selangor. **
2025
-
Demolition of Existing 13-Storey Hotel Sentral JB at Jalan Tenteram, Johor Bahru.
-
Architectural Demolition Works for Hangar 2,3,4 & Multistorey Carpark and Structural Demolition for Inflammable Store & Link Bridge Including Transfer and Removal of Existing Loose Furniture at Complex A, Lapangan Terbang Antarabansa Sultan Abdul Aziz Shah, Subang.
-
Demolition Works for 6 Units of Existing 4-Storey Shop Lot at Jalan Lepas, Johor Bahru.
2024
-
Demolition Works for GSE Building & Pedestrian Bridge, Cleaning & Clearing Works for All MRO Buildings and Removal of Docking at Subang Engineering Complex A, Lapangan Terbang Antarabangsa Sultan Abdul Aziz Shah, Subang.
-
Demolition of 6 Blocks 4-Storey to 8-Storey Condominium at Lot 263, Jalan Madge, Kuala Lumpur.
-
Site Clearance and Installation of Hoarding at Lot 499, Lot 353 and Lot 354, Seksyen 71, Bukit Tunku, Kuala Lumpur.
-
Demolition Works for Reinstatement of Bukit Jalil Casting Yard (SUKE Highway Project).
-
Demolition Works for Expansion & Upgrading of Existing Lapangan Terbang Sultan Ismail Petra (Kota Bharu Airport).
-
Demolition Works of Mint Modernisation Project for Bank Negara Malaysia at Lot 2, Persiaran Selangor (Phase 1 & Phase 2).
2023
-
Demolition Works for Existing Concrete Slabs and Capping Beams at Conlay Station, Kuala Lumpur (KVMRT Line 2).
-
Demolition of Existing Substructure for Construction of New RC Columns & Micropiles at Mutiara Damansara.
-
Demolition Works for TIEM2 Project at Free Trade Zone, Melaka.
2022
-
Demolition Works for Road Bridge Structure - ROB for Section 1, Johor (EDTP - Gemas to Johor Bahru).
-
Demolition Works for River Bridge Structure - BRV for Section 1, Johor (EDTP - Gemas to Johor Bahru).
-
Demolition Works for Existing Buildings and Structures at CLQ CLAB (KVMRT Line 2).
-
Demolition of Reinforced Concrete Structure, Steel Structure and Associated Works at Bandar Malaysia South Batching Plant (KVMRT Line 2).
2021
-
Demolition Works for The Existing Structure at Lot 1, Kajang, Selangor Darul Ehsan (Lot 1 Kajang). (Hybrid Demolition Method)
-
Demolition Works at PT13746, Jalan Inovasi 3, Technology Park Malaysia, Mukim Petaling, Wilayah Persekutuan, Kuala Lumpur (Project Lion Data Centre).
-
Demolition of Existing Warehouse at Lumut, Perak.
-
Supply Labour, Plant and Machinery for Carry Out Diamond Coring and Wire Saw Cutting Works to R.C Slab and Diaphragm Wall at Sentul West Station, Kuala Lumpur (KVMRT Line 2).
-
Demolition Works for Reinforced Concrete Structure, Steel Structure and Associated Works at Titiwangsa Batching Plant, Kuala Lumpur (KVMRT Line 2).
-
Demolition Works for Diaphragm Wall at Hospital Kuala Lumpur Crossover and Intervention Shaft 1 (KVMRT Line 2).
2020
-
Demoliton of Portion of Existng Structures for Addition and Alteration Work at Chan Sow Lin Station, Kuala Lumpur (KVMRT Line 2).
-
Demolition Works With All Associated Works Pedestrian Bridge for Section 3 & ROB30, ROB31, ROB32 for Section 5, Johor (EDTP - Gemas to Johor Bahru).
-
Demolition Works for Labour Accommodation Camp, Site Office, & Canteen for Petronas Rapid Project at Pengerang (Phase 2), Johor.
-
Demolition Works for Diaphragm Wall at Kampung Baru North Station, Kuala Lumpur (KVMRT Line 2).
2019
-
Demolition Works for Labour Accommodation Camp, Site Office, & Canteen for Petronas Rapid Project at Pengerang (Phase 1), Johor.
-
Demolition and Pile Removal to 4-Storey UKM College Hostel and 5 Storey Shoplots at Kg Baru Area, Kuala Lumpur (KVMRT Line 2).
-
Completion of RC Pile Removal of Hospital Kuala Lumpur Crossover & Intervention Shaft 1, Kuala Lumpur (KVMRT Line 2).
2018
-
Demolition Works for MRT Package V205: Construction and Completion of Viaduct Guideway and Other Associated Works from Kg. Muhibbah to Serdang Raya.
-
Demolition Works for MRT Package V201: Construction and Completion of Viaduct Guideway and Other Associated Works from Sungai Buloh to Persiaran Dagang.
-
Demolition Works for MRT Package V203: Construction and Completion of Viaduct Guideway and Other Associated Works from Jinjang to Jalan Ipoh North Portal.
-
Demolition of 100 meter Main Stack (Chimney) & other structure for redevelopment of Lafarge Rawang Plant.
-
Demolition Works for Light Rail Transit Line 3 (LRT 3 - Package GS 07-08).
-
Demolition Works for MMC-Gamuda KVMRT site office & plants at Jalan Cochrane.
-
Demolition of Ampang Park Shopping Mall at Kuala Lumpur (KVMRT Line 2).
2016
2017
-
Demolition Works of the Existing 16-storeys PDRM Quarters at Jalan Sentul Manis, Kuala Lumpur (KVMRT Line 2). (Hybrid Demolition Method)
-
Demolition of Existing Abandoned 8-storey Wisma Awal & Other Buildings for Kampung Baru North Station (KVMRT Line 2).
-
Demolition of Existing Sports Club at Lot 172, Jalan Tun Sambathan 1, Brickfield, Kuala Lumpur.
-
Demolition of TNB Staff Quarters at Lot 491, Seksyen 96A, Bandar Kuala Lumpur.
-
Demolition works including superstructure and substructure for the existing multi-storey carpark at KLCC East Underground Station (KVMRT Line 2).
-
Demolition works at Block C, Bangunan Sultan Abdul Samad for MRT Corp.
-
Demolition of existing 9 Blocks of 9 to 11-storeys Office Building for the Redevelopment of Pusat Bandar Damansara.
-
Demolition Works for The Proposed of Redevelopment of Kompleks Niaga Utama, Lot 350, Bangsar Kuala Lumpur.
-
Demolition Works for the Completed Existing Police Quarters (Block 10 and 11) at Taman Keramat AU1, Ulu Kelang, Gombak, Selangor.
-
Demolition of the pedestrian bridge and buildings at KTM Serdang.
2015
-
Demolition of existing 17- Storeys Condominium including podium carpark at Bangsar (Diamond Cutting & Lifting Method).
-
Demolition of Existing Police Station & 2 Blocks of 11- Storeys Police Quarters for 118 Storeys Warisan Merdeka-KL 118 Project.
-
Demolition of KVMRT Tunnel Boring Plant at Jalan Inai (Including Existing Pile Extraction Work).
-
Demolition of existing concrete roof structure at B. Braun Project, Penang (Diamond Cutting & Lifting Method).
2013
2014
-
Demolition of existing SP Setia Clubhouse for proposed residential development at Pesiaran Kelicap, Pulau Pinang (Approx. 66,000m2).
-
Demolition of existing 7 Storeys Building & Shops Lot at Jalan P. Ramlee. (Rum Jungle)
-
Demolition of Existing Ramp Bridge at Pelabuhan Klang (Phase 2).
-
Demolition of Pedestrian Motor Bridge and Bernas Gantry at Arau, Perlis (+/-100m2).
-
Demolition of Sunway Putra Mall (The Mall), Kuala Lumpur (+/-9,000m2).
-
Demolition of Existing Ramp Bridge at Pelabuhan Klang (Phase 1).
2012
-
Demolition of Former Cigarette Building at Jalan Lahat, Ipoh (Approximately 4,500m2).
-
Demolition of Existing Road Over Bridge at Package N3 (Over 300m per bridge).
-
Demolition of Houses at Jalan Cheras. (Approximately 4,000m2) - MMC Gamuda.
-
Demolition of Roadside Kiosks Along Jln Bukit Bintang - MMC Gamuda.
-
Demolition of existing steel structure factory at Maluri Portal - MMC Gamuda.
-
Demolition of embankment parapet wall at Sg. Siput.
-
Demolition of Remaining Structures and Tree Trimming at Lot 92, Jln Telok Wanjah.
-
Demolition of Existing Alor Setar Shopping Complexe (+/- 36,120m2).
2011
-
Demolition of road over bridge at Kerai Kati.
-
Demolition of Hospital Tunku Fauziah, Kangar, Perlis (Using Non-Hacking Method).
-
Demolition Of Existing Pedestrian Motorcycle Bridge's Ramp at Sg. Siput, Perak (Diamond Cutting and Heavy Lifting).
-
Demolition of Existing Pedestrian Motorcycle Bridge at Kg. Alor Belat, Kedah.
-
Demolition of Existing Bridges at Jalan Teluk Wanjah, Alor Setar.
2010
-
Demolition of road over bridge Jalan Langgar, Alor Setar, Kedah. (At heart of city, live-traffic, limited work space).
-
Crushing granite at Lenggong, Perak (Crushing to crusher-run size).
-
Demolition of Monument (Heritage Structure) - Tugu Rukun Negara (Jalan Telok Wanjah).
-
Demolition of railway bridge Simpang Lawin, Kuala Kangsar.
-
Demolition of house at Taman Ipoh Selatan, Ipoh. (Working Area beside hospital).
2009
-
Demolition of Road Over Bridge, Kanthan
-
Demolition of existing parapet wall and deck slab for Penang Bridge
-
Crushing Granite at Selama, Perak
2008
-
Demolition of Sg. Siput Balai Polis, Perak.
2007
-
Demolition of Makro, Bandar Perai, Seberang Jaya,Penang
-
Demolition of Damansara Clear Water, Selangor. (Removal of underground parking)